par kaladmin | Sep 28, 2017 | Non classé
[vc_row][vc_column][vc_column_text]Construction of two semi-detached houses in Valfleury :[/vc_column_text][vc_column_text]The main difficulty of this project is to adapt to a very steep terrain. Retaining walls in reinforced by concrete sailing 30cm thick were required to seperate le parking spaces, terraces and gardens. At the request of the buyers, the standard of living is under the ground floor and provides the access of the deck. We can go to the garden from the terrace by a few steps. The semi-basement operates the area between the slab of the ground garden and the natural terrain.
Photovoltaic panels producing the renewable and clean energy are installed on the rooftops. The energy performance of the two houses is classified by the BBC Efinergie certified.
End of work : June 2011.[/vc_column_text][vc_separator style=”shadow” border_width=”2″][/vc_column][/vc_row]
par kaladmin | Sep 28, 2017 | Non classé
[vc_row][vc_column][vc_column_text]Infomation kiosk at the shopping center Centre-Deux in Saint Etienne[/vc_column_text][vc_column_text]The information kiosk is located in the center of the shopping-center where passengers converge: the escalator and the mail. We must therefore not only manage the reception desk, but the image seen on the entire volume from the upper floor. The full wave bank follows the flow of passengers and incorporates the place of disableds. The frame of the roof is studied in order to support the printed canvas and incorporate a range of LED lighting.
End of work : May 2011[/vc_column_text][vc_separator style=”shadow” border_width=”2″][/vc_column][/vc_row]
par kaladmin | Sep 28, 2017 | Non classé
[vc_row][vc_column][vc_column_text]Rehabilitation and extension of an existing building in St. Paul en Jarez :[/vc_column_text][vc_column_text]
The goal is to rehabilitate a building standing since more than a century while respecting the original construction. The project plans to develop 8 rental apartments and 4 duplex lofts at the garden level, respecting the current comfort norms. A piece countant the entrance and the common premises is built on the eastern front, visible from the town road. This extension brings a fresh touch to the tenement while reveaving the existing bulding by transparency.
The general layout of the site takes into account the exeptional quality of the environment. Shared common areas such as the park on the Dorlay side and the common courtyard provide many extras that allow peaple to maintain good relationships while a bucolic living.
End of works: July 2012.[/vc_column_text][vc_separator style=”shadow” border_width=”2″][/vc_column][/vc_row]
par kaladmin | Sep 28, 2017 | Non classé
[vc_row][vc_column][vc_column_text]Construction of trios houses in band in Saint Martin la Plaine :[/vc_column_text][vc_column_text]The plots are narrow and ending in a point between the road to Saint Martin la Plaine and a town road. The location of houses follows the morphology of ground to make the most of the gardens. All houses are accessibility standards for disabled people. The town road is widened after work to facilitate the movement of vehicles.
End of works: July 2010.[/vc_column_text][vc_separator style=”shadow” border_width=”2″][/vc_column][/vc_row]
par kaladmin | Sep 28, 2017 | Non classé
[vc_row][vc_column][vc_column_text]Rehabilitation and extension of a house in Chevrière :[/vc_column_text][vc_column_text]
It is a detached house over two levels with undeveloped attic. The project consists of an extension to optimize natural lighting and improve the entry and kitchen.
All external joinery will be refurbished in PVC double glazing. Limited by budget, thermal insulation initially planned by outside will finally carried inside. Alarge opening 5 meters in height will perfomed by a recovery sub-masonry work to create a specific space of the large living-room. The house is not connected to le gas network. Il will be heated by electric heaters inertia.
[/vc_column_text][vc_separator style=”shadow” border_width=”2″][/vc_column][/vc_row]